NEC NDA-30115-001 User Manual

Page of 116
NDA-30115  Revision 1.0
Page 21
Property Management System - Communication Interface
Message Descriptions
Release for 
Maintenance
Either system may request a temporary release of the data link for maintenance 
purposes by transmitting a Data Link Release Request message to the other system. 
The receiving system will perform any necessary processing and return the Data 
Link Release Confirmation message as soon as possible.
During the NEAX maintenance, the PMS may continue to send Nop Test 
messages, provided that EIA pin 6 (Data Set Ready) from the NEAX is in the “on” 
condition. The NEAX will turn on the EIA pin 6 “on” and respond to Nop Test 
messages when maintenance is completed.
While the data link is release on request of the PMS, the NEAX will continue to 
attempt to read Nop Test messages from the PMS. The PMS may set EIA pin 20 
(Data Terminal Ready) to the “off” condition to indicate that reading should not be 
attempted.
When EIA pin 20 is in the “on” state and a Nop Test message is received from the 
PMS, the NEAX will assume that PMS maintenance has ended and that 
communication can be resumed.
NEAX Operations 
During Loss of 
Communication
The NEAX will continue to support the basic telecommunications functions if the 
data link or PMS become unavailable. Upon detection of a data link failure, the 
NEAX will automatically switch to the “Link Failed Mode” to perform the 
following tasks:
Enable Check In and Check Out on the Attendant Console and Front Desk 
Terminal.
Continue support of Message Waiting and/or Controlled Restriction if both 
features are active in the NEAX.
Recovery from 
Loss of 
Communication
In the event of a PMS failure, it is assumed that Check In and Check Out must be 
done manually and entered into the PMS system at a later time. The PMS should 
not resume transmission of the Nop Test message and attempt to reestablish 
communication until the database has been brought up to date. This prevents the 
transmission of incorrect data prematurely through the database recovery 
procedure.
In cases where the PMS has remained operational during a data link failure, the 
PMS will continue to attempt sending Nop Test messages. A Nop Test Answer 
message (either Normal or Recover) from the NEAX will indicate that 
communication has been reestablished.
A Nop Test Normal Answer message indicates that the NEAX has had no status 
change during the data link failure period and has automatically switched back to 
the normal operating mode of an active data link.
A Nop Test Recover Answer message indicates that the NEAX has failed and that 
status memory has been initialized for each room with the following:
Room Status is Occupied (Checked In),
Controlled Restriction Level is set to the preassigned restriction,
Message Waiting Lamps are off,
Wake Up times are cleared.