Nortel Networks BSG12ew User Manual

Page of 66
51
Installation
System verification
The following sections describe how to test the basic functionality of the Business Services 
Gateway 8-port (BSG8ew) and the Business Services Gateway 12-port (BSG12ew/aw/tw).
System verification navigation
Prerequisites for system verification
The BSG8ew/12ew/aw/tw must be connected and powered up.
Verifying the physical system status
Complete this procedure to verify the status of the system.
For information and procedures on monitoring system status using the BSG8ew/12ew/aw/tw Web 
user interface, see Administration (NN47928-600). 
Procedure steps
Step
Action
1
Check the status of the power LED to verify that the system is receiving power.
2
Check the status of the system LED to verify that the system is active.
End