Nortel Networks 201i User Manual
Installing the 201i server in an Option 11C or Option 11C Mini
Standard 1.07
82
CallPilot
See the following diagram:
2 Thread the cable up through the card cage.
Note: When routing the SCSI cable through the card cage, ensure the
second cable ferrite is placed halfway through the opening.
second cable ferrite is placed halfway through the opening.
3 Connect the grounding braid on the intermediate SCSI cable to the card
cage, and tighten the screw.
G101554
A
D
C
B
Intermediate SCSI
cable bracket
assembly NTRH1407
cable bracket
assembly NTRH1407