Nortel Networks Option 11C User Manual

Page of 546
Provisioning
Page 97 of 544
Example:
275 stations at cutover
304 stations at two years
352 stations at five years
Cutover: 275 x 5.5 (CCS/T) x 2 = 3025 CCS total system load
Two-year: 304 x 5.5 (CCS/T) x 2 = 3344 CCS total system load
Five-year: 352 x 5.5 (CCS/T) x 2 = 3872 CCS total system load
Calculating number of trunks required
Enter the values obtained through any of the three previous methods in 
Worksheet A. Add the calculations to the worksheet. Once the trunk CCS/T 
is known and a grade of service has been specified by the customer, the 
number of trunks required per trunk group to meet cutover, two-year, and 
five-year requirements is determined as shown in the following example.
Example
The customer requires a Poisson 1 percent blocking grade of service (see 
Reference Table 1). The estimated trunk CCS/T is 1.14 for a DID trunk 
group. With the cutover, two-year, and five-year number of lines, the total 
trunk CCS is determined by multiplying the number of lines by the trunk 
CCS/T:
Cutover: 275 (lines) x 1.14 (trunk CCS/T) = 313.5 CCS
Two-year: 304 (lines) x 1.14 (trunk CCS/T) = 346.56 CCS
Five-year: 352 (lines) x 1.14 (trunk CCS/T) = 401.28 CCS
Table 21
Default method and manual calculations analysis
Default method
Manual calculations
Difference
Cutover
3025
2863 CCS
162 CCS
Two years
3344
3162 CCS
182 CCS
Five years
3872
3657 CCS
215 CCS