Nortel Networks BSG12aw User Manual

Page of 66
63
Installation
Basic procedures
The following sections describe basic procedures that you use to prepare the Business Services 
Gateway 8-port (BSG8ew) and Business Services Gateway 12-port (BSG12ew/aw/tw) for 
maintenance and restarting the BSG8ew or BSG12ew/aw/tw after maintenance.
Basic procedures navigation
Shutting down the BSG8ew/12ew/aw/tw
Use this procedure to shut down the BSG8ew/12ew/aw/tw. For procedures on how to use the 
BSG8ew/12ew/aw/tw Web User Interface (UI), see Administration (NN47928-600).
Procedure steps
Step
Action
1
Use the Web UI to check for a recent backup of the BSG8ew/12ew/aw/tw 
system programming before powering down the BSG.
2
Unplug the unit. 
End
Restarting the BSG8ew/12ew/aw/tw
Use this procedure to restart the BSG8ew/12ew/aw/tw.
Procedure steps
Step
Action
1
Connect power to the 
BSG8ew/12ew/aw/tw. For more information, see 
 an
.
2
If the most recent configuration is not restored after powering up and logging in 
to the unit, then check for most recent backup.