NEC IP8800/S6300 User Manual

Page of 250
3.   
Troubleshooting Functional Failures in Operation
30
3.4.3
Actions against Troubles on 10BASE-T/100BASE-TX/
1000BASE-T
If a trouble occurs on 10BASE-T/100BASE-TX/1000BASE-T, follow the procedure below to isolate the problem.
1. Checking log
For the log, see the manual "Message Log Reference."
2. Isolating the problem according to the failure analysis method
Isolate the problem according to the failure analysis method listed below.
5
fault
Unavailable configuration has been set.
Use configuration command fldm prefer to 
correctly set flow distribution pattern of the filter 
and QoS function.
6
Use configuration command fwdm prefer to 
correctly set the distribution pattern of the 
maximum number of entries per device.
7
The BSU/PSP is faulty.
According to the log of the BSU displayed by the 
show logging command, see the corresponding 
part in manual "Message Log Reference" and 
follow [Action] described.
8
inactive
[IP8800/S6700]
The inactivate bsu command is set.
Use the activate bsu command to make the 
BSU active, standby hot, or standby cold status. If 
it does not become standby hot or standby cold 
status, see "
."
9
The BSU is not fully inserted.
Install the BSU board correctly.
10
Different type of BSUs are installed together.
Unify the type of all BSU boards.
11
BSU not supported by the software version is 
installed.
Check the BSU board type and software version. 
Replace the BSU board or update the software.
12
BSU not supported by this device is installed.
Replace the BSU board.
13
notconnect
[IP8800/S6700]
The BSU is not installed.
Check if as many BSU boards as required for active 
BSU + standby BSU (if standby BSU is not 
required, only active BSU) are installed. If so, no 
action is required. If not so, install the required 
number of BSU boards.
14
initialize
The BSU/PSP is being initialized.
Wait until initialization completes.
15
disable
[IP8800/S6700]
no power enable is set by configuration 
command.
After checking that the BSU board to be used is 
installed, use configuration command power 
enable to make the BSU active, standby hot, or 
standby cold status. If it does not become standby 
hot or standby cold status, see "
."
No.
BSU Operation
Status
Problem
Action