Orbit Manufacturing 2000 User Manual

Page of 139
Page 4 - 5
Installation
Orbit™ 2000 Operation and Maintenance  Manual
 © GBC Films Group January 2001
4.3  Shipping damage inspection
Before signing the Bill of Lading, youshould  inspect the crate and / or palletfor signs
of damage or missing items; ifapplicable, make note of this on theBill of Lading.
INFORMATION
A L L   S H I P M E N T S   A R E   E X - W O R K S .   A t   o u r d o c k ,   t i t l e   p a s s e s   t o   t h e   b u y e r .   P l e a s e
review your insurance coverage prior to shipment, as you are responsible for all
subsequent freight charges and risks.
INFORMATION
W A R N I N G
The Orbit™ 2000 is a large and heavy piece of equipment. It is necessary to
e m p l o y   L I C E N S E D   R I G G E R S   O N L Y   t o   m o v e   t h e   m a c h i n e .   T h e   m a c h i n e   i s   n o t
designed to be tipped up or sideways in any way. Such action disturbs the exact
alignment of moving parts on the machine and requires extensive realignment.
You can be crushedor seriously injured.
W A R N I N G
GBC Pro-Tech's warranty does not cover malfunction of the equipment due to
mishandling and / or tipping. GBC Films Group bears no responsibility for
personal injury or damage due to moving the machine improperly.