Orbit Manufacturing 2000 User Manual

Page of 139
Page 4 - 6
Installation
 © GBC Films Group January 2001
Orbit™ 2000 Operation and Maintenance  Manual
4.4  Transporting of the machine
The machine is shipped from the factory bolted to
a wooden shipping pallet/ frame.
Note the position of the machine on the pallet/
frame as illustrated to the right.
Moving the machine on the pallet/ frame
can only be accomplished with a lift truck
or a pallet wagon.
The forks of the lift truck/ pallet wagon
must be long enough to reach past the
transport supports on the farthest side
from the lift truck/ pallet wagon.
To remove the machine from the pallet/ frame:
– remove the shipping bolts
– drive the lift truck/ pallet wagon between the
    pallet/ frame and the machine frame
– slowly raise the machine from the pallet/ frame
– Replace the shipping angle irons with the leveling
    feet before final placement.
The shift of the machine from the frame to
the floor is shown on the picture.