GE 1000-1500-2000-3000 VA User Manual

Page of 20
 
OPM_GTU_TWR_1K0_3K0_XUS_V015
 
2
 
DE GT Series: User manual rev date 8-11- 04
 
Digital Energy
 GT Series
g
 
 
 
 
 
CONTENTS 
 
 
 
 
IMPORTANT SAFETY INSTRUCTIONS .................................................3 
 
1.1 Save these instructions 
 
1.2 General 
 
1.3 Installation 
 
1.4 Batteries 
 
1.5 Transport/storage 
 
1.6 FCCIS Interference statements 
 
 
INSTALLATION............................................................................................6 
 
2.1 Package contents  
 
2.2 Location 
 
2.3 Rear panel 
 
2.4 Installation 
 
2.4.1 Stable placing of 2-3kVA model 
 
2.4.2 Connecting an external battery pack 
 
2.4.3 Connecting the RS232/dry contact interface 
 
2.4.4 Connecting the load  
 
2.4.5 Connecting to the utility power supply 
 
2.4.6 Checking the site wiring fault LED 
 
 
OPERATION...............................................................................................10 
 
3.1 Operation Panel 
 
3.2 Start-up 
 
3.2.1 Start-up, utility power available 
 
3.2.2 Start-up, utility power not available (‘cold start’ or ‘battery start’) 
 
3.3 Use: Normal Operation 
 
3.3.1 Normal operation conditions 
 
3.3.2 Normal operation indications  
 
3.3.3 UPS self-test 
 
3.3.4 Silencing the buzzer 
 
3.3.5 Switching off 
 
3.4 Use: Abnormal Conditions  
 
3.4.1 On battery 
 
3.4.2 Battery low  
 
3.4.3 Overload 
 
3.4.4 Bypass operation 
 
3.4.5 Replace battery 
 
3.4.6 Short circuit 
 
 
COMMUNICATION....................................................................................14 
 
4.1 Description 
 
4.2 RS232 
 
4.3 Dry contact 
 
4.4 SNMP plug-in card (optional) 
 
 
OPTIONAL FEATURES............................................................................17 
 
5.1 Extended Runtime 
 
5.2 TVSS (Transient Voltage Surge Suppressor) 
 
 
MAINTENANCE .........................................................................................17 
 
6.1 General maintenance 
 
6.2 Batteries - general 
 
6.3 Batteries - replacement 
 
6.4 Recycling the UPS at the end of service life 
 
 
TROUBLESHOOTING ..............................................................................18 
 
 
SPECIFICATIONS .....................................................................................19