GE 1000-1500-2000-3000 VA User Manual

Page of 20
 
OPM_GTU_TWR_1K0_3K0_XUS_V015
 
7
 
DE GT Series: User manual rev date 8-11- 04
 
Digital Energy
 GT Series
g
 
 
 
 
2.4  Installation 
 
The unit should be installed by service personnel. 
 
IMPORTANT
Before making any connection and switching on the UPS, please check the following 
conditions: 
  your mains supply is 100/110/120 Volts and 50/60Hz, 
  the total power demand of the connected equipment does not exceed the rated 
output power of the UPS (indicated on the rating label). 
 
2.4.1  Stable placing of 1.5kVA-3kVA model 
 
To secure a stable placing of the 2-3kVA 
models it is advised to set up the UPS with 
supporting stands (not included in delivery) as 
shown in fig 2.2.
 
 
 
 
 
 
 
 
 
 
2.4.2  Connecting an external battery pack 
 
1.  Before installation, check whether the nominal voltage of battery pack is suitable for 
the UPS. The voltages mentioned on the battery connectors should match. 
2.  Utilize the battery connection cable that came with the battery pack to connect the 
battery pack to the UPS as shown in fig. 2.5. The other connector of the battery pack 
can be used to connect a second, third etc. pack. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
UL 1778 safety requirement:  
In order to allow quick removal of the battery power cord in case of emergency, just 
plug in the battery power cord; do not fix the connector with screws. 
Fig. 2.3  Connecting external battery pack(s) to the UPS  
(figure shows 1000VA UPS model) 
First battery pack 
Second battery pack 
to third battery pack, etc. 
UPS 
Fig. 2.2  Set up of 2 -3kVA model
Supporting stands 
(not included) 
Batter y connection cable