Sanyo E11A202U User Manual

Page of 47
 
− 21 − 
 
9.3 Outage Simulation Test 
 
You should perform a test of whether the UPS operates properly during a power outage.   
Proper operation is as described below.   
 
Note 
Perform this test before powering the connected load devices on. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 
If your utility power breaker panel is too far away to access conveniently, you can also perform the 
test by setting    MAIN MCCB    to the “OFF” and “ON” positions. 
Because the UPS continues inverter operation, there is a small amount of voltage (under 30V) at the 
input plug. Do not unplug the plug during operation. 
 
  Set the breaker on your utility power breaker panel to “Off”. 
 
  Set the breaker on your utility power breaker panel to “On”. 
Buzzer  
2 beeps..., 2 beeps..., repeated 
 
LEDs  
Green INPUT 
Blinking 
Green INV.ON/STAND BY  Lit 
Green OUTPUT 
Lit
 
Buzzer  
Silent 
 
LEDs  
Green INPUT 
Lit 
Green INV.ON/STAND BY  Lit 
Green OUTPUT 
Lit 
  Startup UPS for a normal operation. (Please refer to section 9.1.)