Powerware 10001100 kVA User Manual

Page of 174
UPS SYSTEM INSTALLATION
EATON Powerware
®
 9395 UPS (1000–1100 kVA) Installation and Operation Manual  
S
  164201764 Rev 1 www.powerware.com
4−8
Front View Base Bracket
UPM Section Base
ISBM Section Base
Bracket from Kit
Screw from Kit
Screw from Kit
Top View Rear Bracket
UPM
Section Top
ISBM
Section Top
Screw from Kit
Screw from Kit
Bracket from Kit
Back
Top View Front Bracket
UPM
Section Top
Screw from Kit
Screw from Kit
ISBM
Section Top
Bracket from Kit
Front
Figure 4-7. ISBM Section to UPM Section Joining Brackets
4.4
Electrically Connecting the Sections
1.
2.
Remove the door. Remove the retaining screw located inside the door at the
bottom hinge pivot point, then lift the door off. Retain the hardware for later use.
3.
Remove the screws securing the ISBM section right bottom internal safety
shield panel and remove the panel to gain access to the internal input, output,
and battery terminals. Retain the hardware for later use.
NOTE  AC and DC input intercabinet power wiring harnesses are supplied coiled and secured in the UPM
wireway on the left side of the UPM section (see Figure 4-6 on page 4−7).
4.
Locate the AC and DC input intercabinet power wiring harnesses (long cables
labeled xG1, xG2, and xG3). Remove wire ties as necessary and uncoil the
cables.
5.
Locate the 1G1, 1G2, 2G1, 2G2, 3G1, and 3G2 power wiring harnesses. Route
these harnesses through the wiring access in the right side panel of the ISBM
section to the AC Input to UPMs terminals. See Figure 4-8 on page 4−11 for
terminal locations.