Powerware 10001100 kVA User Manual

Page of 174
INSTALLING OPTIONS AND ACCESSORIES
EATON Powerware
®
 9395 UPS (1000–1100 kVA) Installation and Operation Manual  
S
  164201764 Rev 1 www.powerware.com
5−12
instructions.
NOTE  Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
11. Contact an Eaton service representative for verification and testing of the RIM II
and its connections prior to making connections with J1 through J4 (see
Table 5-6 and Figure 5-9).
You can order interface cables separately for connecting to the 15-Pin D-Sub
Connectors.
Table 5-6. J1 through J4 Interface Connectors
Status
J1 through J4
Description
UPS AVAILABLE
Pins 1 and 12
Contacts are closed when the UPS is operating in Normal mode
or ready to supply the load.
UPS OFFLINE
Pins 3 and 13
Contacts are open when the UPS is offline. Contacts are closed
when the UPS is operating in Normal mode.
BATTERY WEAK
Pins 5 and 14
Contacts are closed when approximately two minutes of battery
time remains before the critical load is lost.
UTILITY FAILURE
Pins 6 and 15
Contacts are closed when Utility Failure is detected.
15−Pin D-Sub
Connectors
Figure 5-9. J1, J2, J3, and J4 15−Pin D−Sub Connectors