Powerware 10001100 kVA User Manual

Page of 174
INSTALLING OPTIONS AND ACCESSORIES
EATON Powerware
®
 9395 UPS (1000–1100 kVA) Installation and Operation Manual  
S
  164201764 Rev 1 www.powerware.com
5−13
5.5
Installing an Optional Supervisory Contact Module II
To install SCM II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7, UPS Operating Instructions," for shutdown instructions.
2.
NOTE  If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not
use hollow wall anchors.
3.
NOTE  When installing signal wiring for CAN card J3 terminals, conduit must be installed between the
device and the UPS cabinet.
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or
punch conduit holes (see Figure 4-16 on page 4−18).
5.
Reinstall the conduit landing plate.
6.
7.
NOTE  120 Vac for the SCM II should be supplied from the critical bus by facility planners or the customer.
8.
Ground
Terminal
Terminal TB1 Signal
Connections from the UPS
Terminal TB3
120 Vac Power
Terminal TB2 Customer
Supervisory Contact Interface
Figure 5-10. Supervisory Contact Module II Terminal Location