Allied Telesis GS900/5E User Manual

Page of 40
Chapter 2: Installation
26
Unpacking the Switch
To unpack an AT-GS900/16 or an AT-GS900/24 switch, perform the 
following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the 
original shipping material if you need to return the unit to Allied 
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure the following hardware components are included in your switch 
package. If any item is missing or damaged, contact your Allied 
Telesis sales representative for assistance.
ˆ
One AT-GS900/16 or AT-GS900/24 Fanless Gigabit Ethernet 
switch
ˆ
Two rackmounting brackets
ˆ
Eight flathead Phillips screws
ˆ
Four #10-32 Phillips screws with a nylon washer
ˆ
Four self-adhesive rubber feet
ˆ
AC power cord
ˆ
Documentation CD