Allied Telesis X610-24SPS/X User Manual

Page of 128
Chapter 3: Installing the Hardware
94
Cabling an 
AT-x6EM/XS2 
Stacking Module
1. Remove the dust plug from a transceiver slot on the switch, as shown 
in Figure 64
RPS 
READ
Y
STACK
ING
 risk of 
rvicing 
AT-LX44
CPUCV
R
AT-x6EM/X
S2
1
2
L/A
L/A
POWER
SFP+
SFP+
CLASS 1
LASER P
RODU
CT
10G L
INK
ACT
L/A
RPS 
READ
Y
STACKING
 risk of 
rvicing 
AT-LX44CPUCVR
AT-x6EM/X
S2
1
2
L/A
L/A
POWER
SFP+
SFP+
CLASS 1
LASER P
RODUCT
10G LINK
ACT
L/A
Figure 64. Removing a Dust Plug from a SFP+ Slot
2. Remove the transceiver from its shipping container and store the 
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place, as shown in 
Figure 65. Installing an SFP+ Transceiver