Allied Telesis AT-GS950/16 User Manual

Page of 44
Chapter 2: Installation
30
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the 
original shipping material if you need to return the unit to Allied 
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the following hardware components are included in your 
switch package. If any item is missing or damaged, contact your Allied 
Telesis sales representative for assistance.
ˆ
One AT-GS950/16 or AT-GS950/24 Smart Switch
ˆ
Two rack-mount brackets 
ˆ
Eight rack-mount bracket screws (black)
ˆ
Four rack-mounting screws (stainless steel)
ˆ
Four rubber feet (for desktop use)
ˆ
One management cable
ˆ
One power cord
ˆ
Documentation CD