Allied Telesis AT-GS950/16 User Manual

Page of 44
AT-GS950/16 and AT-GS950/24 Gigabit Ethernet Smart Switches Installation Guide
31
Installing the Switch on a Desktop
You can install the AT-GS950/16 and AT-GS950/24 Gigabit Ethernet 
Smart Switches on a desktop or in a standard 19-inch equipment rack. To 
install the switch in a rack, refer to “Installing the Switch in an Equipment 
Rack” on page 32
.
To place the switch on a desktop, perform the following procedure:
1. Remove all equipment from the package and store the packaging 
material in a safe place.
2. Turn the switch over and attach the four rubber feet to the bottom of 
the switch as shown in Figure 6.
Figure 6. Attaching the Rubber Feet
3. Turn the switch over again and place it on a flat, secure surface (such 
as a desk or table) leaving ample space around the unit for ventilation.
1299
LINK/AC
T
SPEED
LINK/AC
T
SPEED
POWER
15
16
LINK/AC
T
1
3
5
7
9
11
13
15
2
4
6
8
10
12
14
16
AT-GS950/16 
16-Por
t 10/100/1000Mbps + 2 SFP Combo WebSmar
t Switch