SECTION 3 TESTING & SERVICE
3--1
PREVENTIVE MAINTENANCE
Reasonable care in preventive maintenance will insure
high reliability and long life for the automatic transfer
switch.
Operate the switch at least once a month. Perform this
four step Electrical Operation Test. This is a test with
load transfer.
Transfer Switch Test
1. Press and hold the door-mounted
TRANSFER
SWITCH TEST button until the engine starts and
runs. This should happen within 15 seconds.
2. The transfer switching device will operate to the
Emergency position. If the
Transfer To Emer-
gency Delay is used, the transfer will occur after
a time delay (up to 5 minutes). For immediate
transfer press
BYPASS TIME DELAY button.
3. The transfer switching device will operate back
to Normal position after the
Retransfer To Nor-
mal Delay (up to 30 minutes). For immediate
retransfer press
BYPASS TIME DELAY button.
4.
Unloaded Running (Engine Cooldown) Delay
allows engine to run unloaded for 5 minutes.
Clean and inspect the switch once a year. De-energize
all sources, then brush and vacuum away any excessive
dust accumulation. Remove the transfer switch barriers
and check contact condition. The non–replaceable main
contacts are designed to last the life of the transfer switch.
Reinstall the barriers carefully.
Maintain transfer switch lubrication. The transfer
switch has been properly lubricated, and under normal
operating conditions no further lubricating is required.
Renew factory lubrication if the switch is subjected to
severe dust or abnormal operating conditions.
Relubricate the solenoid operator if a coil is replaced.
Do not use oil. Order lubrication 625550–001 (Castrol
EndurexR
4000 lubricant).
Replacement parts. Replacement parts are available in
kit form. When ordering parts provide the Serial No. and
Catalog No. from the transfer switch nameplate.
Contact your local ASCO Power Technologies sales
office.
DISCONNECTING THE CONTROLLER
The harness disconnect plugs are furnished for repair
purposes only and should not have to be unplugged. If the
controller must be isolated, follow these steps carefully.
Disconnecting the Plugs
1. Observe the position of the transfer switching device.
a. If the transfer switching device is in the Normal
position, place standby engine starting control in the
off
position. Then open the emergency source circuit
breaker.
b. If the transfer switching device is in the Emergency
position, open the normal source circuit breaker.
Place the engine starting control in the test or run
position.
2. Separate the quick disconnect plugs by squeezing
the latches. Do not pull on the harness wires.
3. Label, remove, and tape the signal wires connected
to the engine start terminals on the transfer switch-
ing device: TB1 and TB3, or TB1 and TB2.
Reconnecting the Plugs
1. Observe the position of the transfer switching device.
a. If the transfer switch is in the Normal position, be
sure that the standby engine starting control is still
in the off position. The emergency source circuit
breaker still should be open.
b. If the transfer switch is in the Emergency position,
normal source circuit breaker still should be open.
2. Reconnect the signal wires connected to the
appropriate engine start terminals on the transfer
switch. See Section 1Engine Starting Contacts.
3. The harness plugs and sockets are keyed. Carefully
align the plugs with the sockets and press straight in
until both latches click.
4. Restore the opposite source as follows:
a. If the transfer switch is in the Normal position,
place the standby engine starting control in the
automatic
position. Then close the emergency
source circuit breaker.
b. If the transfer switch is in the Emergency position,
close the normal source circuit breaker. The load will
be automatically retransferred to the normal source
after the Retransfer to Normal Delay. For immediate
retransfer, press BYPASS TIME DELAY button.
Place the engine starting control in the automatic
position.