Bunn AF PR-3 User Manual

Page of 17
12
SERVICE (cont.)
REFILL SWITCHES
FIG. 12  REFILL SWITCHES
Location:
 
The refill switches are located on the upper 
right front of the autofill box. 
Test Procedures:
1.  Disconnect the dispenser from the power source.
2.  Disconnect  the two white/red, brown/black or red/
black wires from the switch terminals.
3.  Check for voltage across the white/red, brown/
black or red black wires from the test/operate 
switch and the white wire on solenoid #2 or #3. 
Connect the dispenser to the power source. The 
indication must be:
 
a) 120 volts ac for two wire 120 volt models
  b) 200 to 240 volts ac for two wire  200 or 240 
volt models.
4.  Disconnect the dispenser from the power source.
If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the wir-
ing diagrams and check the dispenser wiring harness.
5.  Check for continuity across the switch terminals 
with the switch in the “ON” position. Continuity 
must not be present when the switch is in the 
“OFF” position.
If continuity is present as described, reconnect the 
P1561
FIG. 13 REFILL SWITCH TERMINALS
P1522
#1
 AFPR-2 & 3
#2
 AFPR-2 & 3
#3
 AFPR-3 ONLY
RED/BLK from Test/
Operate Switch
RED/BLK to Vacuum
Switch #1
BRN/BLK from Test/
Operate Switch
BRN/BLK to Vacuum
Switch #2
WHI/RED from Test/
Operate Switch
WHI/RED to Vacuum
Switch #3
wires to the switch terminals.
If continuity is not present as described, replace the 
switch.
Removal and Replacement:
1.  Remove the wires from the switch terminals.
2.  Compress the clips inside the autofill box and 
gently push the switch through the opening in the 
front of autofill box.
3.  Push the new switch into the opening and spread 
the clips to hold switch in the autofill box.
4.  Refer to Fig 13 when reconnecting the wires.
28791.1 011500