Kobe Range Hoods CH0030SQB User Manual
6
UNDER THE CABINET INSTALLATION
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR
HOOD, PREVENT DEBRIS FROM
ENTERING THE VENT OPENING.
Decide the location of the venting pipe
from the hood to the outside. Refer to
Figure 1.
A straight, short venting run will allow
the hood to perform more efficiently.
Try to avoid as many transitions,
elbows, and long run as possible. This
may reduce the performance of the
hood.
Temporarily wire the hood to test for
proper operation before installing.
Important: Peel protective film off
the hood (if any).
For installing under the cabinet with
recessed bottom, attach 4-inch wide
wood filler strips (not included) on
each side. Refer to Figure 2.
Measure and create access opening
for electrical wires and plastic exhaust
under the cabinet.
Hood Installation
CAUTION: If required to move the cooking
range to install the hood, turn off the
power on an electric range at the main
electrical box. SHUT OFF THE GAS
BEFORE MOVING A GAS RANGE.
1.
Puncture the knockout holes on the
hood as shown in Figure 3.
2.
Using references on Table 1 and
measurements on page 14-15 center
the hood in place beneath the cabinet
and flush with the front of the cabinet.
3.
Draw electrical wires through cabinet
access opening.
4.
From the bottom of the hood, place
screw (not provided) into the exact
center of each knockout hole. Make
sure all screws are in place before
tightening screws. CAUTION: MAKE
SURE THE HOOD IS SECURE
BEFORE RELEASING.
5.
Make sure to leave this manual for the
homeowner.
Figure 1
Figure 2
Figure 3
Figure 4