Kobe Range Hoods CH0030SQB Manuel D’Utilisation

Page de 28
 
 6 
UNDER THE CABINET INSTALLATION 
 
 
Preparation before Installation 
 
NOTE:  TO  AVOID  DAMAGE  TO  YOUR 
HOOD,  PREVENT  DEBRIS  FROM 
ENTERING THE VENT OPENING. 
 
 
Decide the location of the venting pipe 
from the hood to the outside.  Refer to 
Figure 1. 
 
A straight, short venting run  will allow 
the hood to perform more efficiently. 
 
Try  to  avoid  as  many  transitions, 
elbows, and long run as possible.  This 
may  reduce  the  performance  of  the 
hood. 
 
Temporarily  wire  the  hood  to  test  for 
proper operation before installing. 
 
Important:    Peel  protective  film  off 
the hood (if any).  
 
For  installing  under  the  cabinet  with 
recessed  bottom,  attach  4-inch  wide 
wood  filler  strips  (not  included)  on 
each side.  Refer to Figure 2. 
 
Measure  and  create  access  opening 
for electrical wires and plastic exhaust 
under the cabinet. 
 
Hood Installation 
 
CAUTION: If required to move the cooking 
range  to  install  the  hood,  turn  off  the 
power  on  an  electric  range  at  the  main 
electrical  box.    SHUT  OFF  THE  GAS 
BEFORE MOVING A GAS RANGE. 
 
1. 
Puncture  the  knockout  holes  on  the 
hood as shown in Figure 3. 
2. 
Using  references  on  Table  1  and 
measurements  on  page  14-15  center 
the  hood  in  place  beneath  the  cabinet 
and flush with the front of the cabinet. 
3. 
Draw  electrical  wires  through  cabinet 
access opening. 
4. 
From  the  bottom  of  the  hood,  place 
screw  (not  provided)  into  the  exact 
center  of  each  knockout  hole.    Make 
sure  all  screws  are  in  place  before 
tightening screws.  CAUTION: MAKE  
SURE THE HOOD IS SECURE 
BEFORE RELEASING.
 
5. 
Make  sure  to  leave  this  manual for  the 
homeowner. 
 
 
 
 
Figure 1 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 2 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 3 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 4