Hobie V2 Drum User Manual

Page of 4
 
1
Assembling the new Mirage Drive drums and cables 
 
Caution:  The new cables and drums are slotted for easier maintenance and 
tune ups.  They are not interchangeable with the older parts. 
 
Warning:  If cables are installed incorrectly, they may twist off the drums, 
causing the Drive to fail.  
 
Tip:  DO NOT REUSE Nyloc nuts when installing new cables.  The slotted cable 
threads have 40% less area -- worn Nylocs may back out causing Drive failure or 
adjustment problems. 
 
Tools and materials required: 
 
7/16 inch wrench 
needle nose pliers 
Marine grade axle grease 
 
Preparation: 
 
1. Remove old drums, cables and chains 
2. Wipe drum axle clean 
3. Pre-install crank arms to the drums, noting left and right crank arms 
 
Installation: 
 
1. Install new chains / cables on 
sprockets, taking care to press chain 
solidly into master cog (Plastic sprockets 
only).  This may be accomplished with the 
masts and fins on or off.  Verify that chain 
is properly centered.  (Tip: mark center