AT&T 555-230-894 User Manual

Page of 332
Test Switch Processing Element (SPE)  Duplication 
Memory Shadowing Link
Issue 1  September 1995 
8-11
  
Screen 8-10.
Example Test Results for Tone-Clock 1A
Test Switch Processing Element (SPE)
Duplication Memory Shadowing Link
For High and Critical Reliability systems, test the Switch Processing Element 
(SPE) duplication; memory shadowing link. 
1. Verify the screen displays:
command:
2. Type test shadow-link and press 
ENTER
.
3. Verify the screen displays test results similar to the example shown on the 
following page:
test tone-clock 1a                                                         SPE A
                                  TEST RESULTS
   Port      Maintenance Name  Alt. Name Test No. Result            Error Code
   01A       TONE-BD                     46       PASS
   01A       TONE-BD                     52       PASS
   01AXX01   ETR-PT                      42       PASS
   01AXX01   ETR-PT                      43       PASS
   01AXX02   ETR-PT                      42       PASS
   01AXX02   ETR-PT                      43       PASS
   01AXX03   ETR-PT                      42       PASS
   01AXX03   ETR-PT                      43       PASS
   01AXX04   ETR-PT                      42       PASS
   01AXX04   ETR-PT                      43       PASS
   01AXX05   ETR-PT                      42       PASS
   01AXX05   ETR-PT                      43       PASS
   01AXX06   ETR-PT                      42       PASS
   01AXX06   ETR-PT                      43       PASS
 Command successfully completed
 Command: