DEFINITY System Installation Roadmap
Issue 1  September 1995 
1-3
DEFINITY System Installation 
Roadmap
This section is intended to provide a high-level sequence for the installation 
process and also a roadmap to the information in this book. It is also noted 
where specific steps are covered in other books.
Plan and Prepare the Site 
Complete this task by following the instructions provided in Chapter 2.
1. Determine what was ordered for the customer:  DEFINITY System 
Generic 3, number of cabinets and port networks, management 
terminals, adjuncts, consoles, telephones, modems, external trunks, etc.
2. Locate DEFINITY System equipment room and lay out equipment room 
floorplan for system cabinets, management terminal and desk, cross-
connect hardware and adjuncts, etc. 
3. Lay out and ensure appropriate power for switch and management 
terminal in equipment room and arrange for an electrician to install.
4. Lay out and ensure appropriate grounding in equipment room (refer to  
5. Determine location of equipment closets where large cables can be 
connected out into smaller ones. 
6. Determine where external trunk lines come into the building and where 
external trunk converters and adapters will be installed. 
7. Determine an appropriate available port circuit on DEFINITY System for 
each telephone, trunk, and peripheral connection needed and create a 
provisioning plan.
Unpack the Cabinets
Complete this task by following the instructions provided in Chapter 3.
1. Unpack and inspect the cabinets.
2. Check circuit packs.
Install and Connect the Cabinets
Complete this task by following the instructions provided in Chapter 4.
1. Install earthquake floor mounting if needed (refer to  Appendix A, 
2. Position and stack cabinets.
3. Connect system cabinet grounds.