AT&T 555-230-894 User Manual

Page of 332
Install and Connect the Cabinets
4-30
Issue 1  September 1995 
Install Back Panels
Install the back panels, tightening the screws when all panels are in place. Allow 
the screws labeled callout 4 in Figure 4-21 on page 4-31 to remain loose.
Install Ground Plates
The ground plate (Figure 4-20) provides the ground connection for the cabinets 
and stabilizes the cabinets. 
Figure 4-20.
Ground Plate
1
2
3
Figure Notes:
1. Front Ground Plate
2. Battery
3. Back Ground Plate
Side View of 2-Cabinet Port Network