Desa (V)CD36TNE User Manual

Page of 52
www.desatech.com
116035-01E
19
VENTING INSTALLATION 
INSTRUCTIONS
Continued
vertical Termination Configurations for 
Top vent
Figures 30 and 33 show four different configura-
tions for vertical termination. 
VERTICAL VENT INSTALLATIONS USING 
MULTIPLE 90° ELBOWS (V)CD36T TOP 
VENT
Figure 31 - Vertical Venting 
Configuration Using Two 90° Elbows
(Model (V)CD36T with Vertical Round 
High Wind Termination)
Figure 32 - Vertical Venting 
Configuration Using Two 90° Elbows
(Model (V)CD36T with Vertical Round 
High Wind Termination)
Note:  Vertical (V
1
) + Vertical (V
) = 40' Max.
 
Max. Horizontal Above 14' Vertical = 0'
Figure 30 - Vertical Venting 
Configuration using Three 90° Elbows
(Model (V)CD36T with Vertical Round 
High Wind Termination)
venting with Two 90° 
Elbows
vertical 
(v
1
)
Horizontal 
(H)
8' Min.
9' Max
9' Min.
11' Max
10' Min.
13' Max
1' Min.
17' Max
14' Min.
0' Max
venting with Three 90° Elbows
vertical (v)
Horizontal (H
1
) + 
Horizontal (H
2
)
8' Min.
5' Max
10' Min.
8' Max
1' Min.
11' Max
14' Min.
14' Max
16' Min.
17' Max
18' Min.
0' Max
40' Min.
0' Max
venting with Two 90° Elbows
vertical (v)
Horizontal (H)
8' Min.
6' Max
9' Min.
8' Max
10' Min.
10' Max
1' Min.
14' Max
14' Min.
18' Max
40' Min.
0' Max
Note: Install a 
VR-58 vertical 
restrictor ring 
into inner pipe 
section prior to 
attaching vent 
termination 
cap.
90° Elbow
90° Elbow
Note: Install a 
VR-58 vertical 
restrictor ring 
into inner pipe 
section prior to 
attaching vent 
termination 
cap.
90° Elbow
Note: Install a 
VR-58 vertical 
restrictor ring 
into inner pipe 
section prior to 
attaching vent 
termination 
cap.