Paradyne CSU User Manual

Page of 470
8. Troubleshooting
9128-A2-GB20-80
September 2002
8-25
Connectivity
Connectivity is a proprietary method that determines whether the
 
FrameSaver 
device at the other end of the frame relay PVC is active. This test stops 
automatically and can only be executed for circuit multiplexed PVCs. 
To run a connectivity test on a link:
Main Menu
Test
[Network PVC Tests/Data Port PVC Tests/
ISDN Call/PVC Tests]
Selecting Connectivity sends a frame to the
 
FrameSaver unit at the other end of 
the PVC. A 
RndTrip Time(ms)
 message appears in the Result column when a 
response is received within 5 seconds, indicating that the FrameSaver unit at the 
remote end is alive (operational and connected), and the round trip (RT) time is 
shown in milliseconds (ms), with a resolution of 1 ms. If a response is not received 
within 5 seconds, 
No Response
 appears in the Result column.
Test Call
Test Call tests the device’s ability to place a call. It allows an alternate means of 
controlling the activation or deactivation of an ISDN link. This test only appears for 
a FrameSaver device with a DBM that is configured to originate backup calls 
(typically, the remote site) and has its ISDN Link Status option set to Auto.
To place a test call:
Main Menu
Test
ISDN Call/PVC Tests
When a test call is started, 
Active
 appears in the Status column. While the call is 
Active, the status of the call connection and the link appears in the Results 
column. 
„
Frame Relay Link Up
 message indicates that the required calls have 
been made and the link is successfully passing LMI data. 
„
Frame Relay Link Suboptimal
 message indicates that at least one 
call has been made on the link, the link is successfully passing LMI data, but 
the Maximum Link Rate configured in the ISDN Link Profile has not been 
achieved for the link. 
„
Frame Relay Link Down
 message indicates that the call attempts were 
not successful.
NOTE:
Primary network data is not affected by a test call. If there is a network failure 
while a test call is active, the test call is terminated and the call is automatically 
converted to a backup call.