Polycom (RMX) 1500 User Manual

Page of 1010
Polycom RealPresence Collaboration Server (RMX) 1500/2000/4000 Administrator’s Guide 
21-42
Polycom, Inc.
2
Select the appropriate Hot Backup Triggers check boxes:
3
Alternatively, click the Trigger Failover Manually button when you want to trigger the 
Hot Backup manually and activate the Slave MCU.
A confirmation message is displayed.
4
Click Yes to continue the Hot Backup process or click No to cancel the Hot Backup 
process.
5
Click OK.
Modifications to the Master MCU Requiring System Reset
Modifications to the configuration of the Master MCU that require a System Reset cannot be 
performed while Hot Backup is enabled.
To modify the Master MCU configuration:
1
Disable the Hot Backup on the Master and Slave MCUs.
2
Modify the Master MCUs configuration.
3
Reset the Master MCU.
4
When the reset is complete, enable Hot Backup on the Master and Slave MCUs.
5
If required, reset the Slave MCU.
Table 21-5  
Hot Backup Triggers
Hot Backup Trigger
Description
Lost connection with management 
port
Initiates the Hot Backup switch from the Master to 
the Slave MCU when the connection to the 
management port is lost on the Master MCU. This 
trigger is always set.
Lost connection with media port
Initiates the Hot Backup switch from the Master to 
the Slave MCU when the connection with an active 
media port is lost on the Master MCU.
Lost connection with signalling port
Initiates the Hot Backup switch from the Master to 
the Slave MCU when the connection with an active 
signalling port is inactive for a duration of 30 
seconds on the Master MCU. A system flag, 
ETH_INACTIVITY_DURATION, can be added and 
configured to modify the duration of inactivity of the 
signalling port. Default value is 30 seconds; 
Minimum value is 20 seconds.
Lost connection with ISDN card
Initiates the Hot Backup switch from the Master to 
the Slave MCU when the connection with an ISDN 
card is disconnected on the Master MCU.