Quantum atl 7100 Installation Instruction

Page of 68
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
11
Chapter 2
2
Unpacking and Moving the
Library
This chapter describes how to unpack and move the library to the 
final installation area.
Receiving the Library
2
When you receive the crated library, unload it as close to the final 
installation area as possible and allow approximately ten feet in 
front of the off-load side of the pallet. This ensures that there is 
enough space to lower the ramp before removing the library from 
the pallet. 
Also make sure that the room has a minimum ceiling height of 
eight feet to provide clearance for removal of the box from the 
pallet.
Caution:
The procedures in this chapter must be performed in 
the order in which they appear in this chapter.