Quantum atl 7100 Installation Instruction

Page of 68
Chapter 1  Library Specifications and Site Requirements
Site Requirements
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
9
The power inlet connector is a IEC-320 connector. For international 
applications you must replace the power cord set with a 
harmonized 3x2.0mm
2
 power cord set that is approved by the 
country where used.
Figure 4  Library AC 
Power Receptacle
Grounding
1
The installation site must provide an earth ground cable for the 
library.
Ground
Line
Neutral
~100-120V / ~200 - 240V
3.5A / 7A
50/60 Hz
IEC-320 Type