Enterasys 6000 User Manual

Page of 38
Chapter 3: 6C105 Setup
3-2
6C105 Overview and Setup Guide
3.2
SETTING UP THE 6C105
The following sections describe the procedures that must be followed to 
complete the installation of the 6C105.
3.2.1
Installation Order
Once a suitable site has been chosen, the 6C105 can be installed. The 
chassis can be freestanding or rack mounted.
It is recommended that the 6C105 installation proceed in this order:
1.
Install the cable management bar.
2.
Mount the chassis to a 19-inch rack or other secure location.
3.
Attach the Electrostatic Discharge Wrist Strap.
4.
Install the Power Supply Module(s).
5.
Install the Interface Modules.