Amana ngd5500tq Installation Instruction

Page of 32
7
NOTE: The following kits for close clearance alternate 
installations are available for purchase. Please see the 
“Assistance or Service” section of the Dryer User Instructions.
Over-the-Top Installation: 
Part Number 4396028
Periscope Installation (For use with dryer vent to wall vent 
mismatch):
Part Number 4396037 - 0" (0 cm) to 18" (45.72 cm) mismatch
Part Number 4396011 - 18" (45.72 cm) to 29" (73.66 cm) 
mismatch
Part Number 4396014 - 29" (73.66 cm) to 50" (127 cm) 
mismatch
Special provisions for mobile home installations
The exhaust vent must be securely fastened to a noncombustible 
portion of the mobile home structure and must not terminate 
beneath the mobile home. Terminate the exhaust vent outside.
Determine vent path
Select the route that will provide the straightest and most 
direct path outdoors. 
Plan the installation to use the fewest number of elbows and 
turns. 
When using elbows or making turns, allow as much room as 
possible. 
Bend vent gradually to avoid kinking. 
Use the fewest 90° turns possible.
Determine vent length and elbows needed for best 
drying performance
Use the Vent system chart below to determine type of vent 
material and hood combinations acceptable to use.
NOTE: Do not use vent runs longer than those specified in 
the Vent system chart. Exhaust systems longer than those 
specified will:
Shorten the life of the dryer.
Reduce performance, resulting in longer drying times and 
increased energy usage.
The Vent system chart provides venting requirements that will 
help to achieve the best drying performance.
Vent system chart
NOTE: Side and bottom exhaust installations have a 90º turn 
inside the dryer. To determine maximum exhaust length, add one 
90º turn to the chart.
Install Vent System
1. Install exhaust hood. Use caulking compound to seal exterior 
wall opening around exhaust hood.
2. Connect vent to exhaust hood. Vent must fit inside exhaust 
hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.
3. Run vent to dryer location. Use the straightest path possible. 
See “Determine vent path” in “Plan Vent System.” Avoid 90º 
turns. Use clamps to seal all joints. Do not use duct tape, 
screws or other fastening devices that extend into the interior 
of the vent to secure vent.
Install Leveling Legs
1. To protect the floor, use a large flat piece of cardboard from 
the dryer carton. Place cardboard under the entire back edge 
of the dryer. See illustration.
2. Firmly grasp the body of the dryer (not the top or console 
panel). Gently lay the dryer on the cardboard. 
Number of 
90º turns 
or elbows
Type of
vent
Box or 
louvered 
hoods
Angled
hoods
0
Rigid metal
Flexible metal
64 ft (20 m)
36 ft (11 m)
58 ft (17.7 m)
28 ft (8.5 m)
1
Rigid metal
Flexible metal
54 ft (16.5 m) 
31 ft (9.4 m)
48 ft (14.6 m)
23 ft (7 m)
2
Rigid metal
Flexible metal
44 ft (13.4 m)
27 ft (8.2 m)
38 ft (11.6 m)
19 ft (5.8 m)
3
Rigid metal
Flexible metal
35 ft (10.7 m)
25 ft (7.6 m)
29 ft (8.8 m)
17 ft (5.2 m)
4
Rigid metal
Flexible metal
27 ft (8.2 m)
23 ft (7 m)
21 ft (6.4 m)
15 ft (4.6 m)
WARNING
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.