Jet manual ferrous cold saw - cs-275 User Manual

Page of 32
 
8
7.0  Unpacking 
Open shipping container, and any secondary 
boxes. Check for shipping damage; report any 
damage immediately to your distributor and 
shipping agent. Do not discard any shipping 
material until the Cold Saw is assembled and 
running properly.  
Compare the contents of your container with the 
following parts list to make sure all parts are intact. 
Missing parts, if any, should be reported to your 
distributor. Read the instruction manual thoroughly 
for assembly, maintenance and safety instructions. 
7.1  Contents of shipping container 
1 Cold 
Saw 
1 Operating 
Lever 
Work Stop Assembly 
Hex Cap Screws with Nuts  
1 Handle 
1 Roller 
Assembly 
2 Splash 
Plates 
Coolant Tank w/ Pump (inside base) 
Operating Instructions and Parts Manual 
(not shown) 
Warranty Card (not shown)
 
 
Figure 2
8.0  Installation and assembly 
Tools required for assembly (not provided): 
 
6mm hex key (Allen wrench) 
12mm and 19mm open-end wrenches 
 
Remove all packing material from around the 
machine. Remove screws holding the saw to the 
skid. Lift the machine off the skid using straps 
around the cast iron portions of the head (keep 
straps away from blade, levers, etc.). 
The location should have sufficient lighting to 
prevent shadows around the work area. Leave 
enough room on all sides of the machine for 
movement of stock and for general maintenance 
work.  
 
 
The base of the machine must be anchored to the 
floor by two lag bolts or studs properly anchored 
into concrete.  
After positioning the machine, remove any cords 
that were used to secure the head in lowered 
position during shipping. 
Exposed metal surfaces have been coated with a 
rust-protectant from the factory. Remove this using 
a soft cloth dampened with a good 
cleaner/degreaser. Do not use gasoline, paint 
thinner, acetone, or other highly flammable 
substances, and avoid using an abrasive pad as it 
may scratch metal surfaces.