To rack-mount each EPS-LD unit:
1
Place the EPS-LD unit upright on a stable surface, with the side you want to face to the front of the
switch toward you.
switch toward you.
2
Remove the mounting bracket kit from the packaging.
3
Attach the mounting brackets as follows:
a
Place a mounting bracket over the mounting holes on one side of the unit (see
b
Insert the provided screws and fully tighten them using a screwdriver.
Figure 98: Attaching the Mounting Bracket
c
Repeat steps
for the other side of the EPS-LD unit.
4
Slide the EPS-LD into a 19-inch rack and secure it using appropriate rack-mount screws.
NOTE
Extreme Networks recommends that you position the EPS-LD so that the output connectors are on the same side
as the external connector on the connecting switch. If you mount the EPS-LD with the connectors facing in the
opposite direction from the Summit switch connector, leave at least 1 U between the switch and the EPS-LD
through which to slide the power cords. Do not route the power cords around the equipment rack.
as the external connector on the connecting switch. If you mount the EPS-LD with the connectors facing in the
opposite direction from the Summit switch connector, leave at least 1 U between the switch and the EPS-LD
through which to slide the power cords. Do not route the power cords around the equipment rack.
Connecting the EPS-LD to the Switch
CAUTION
Do not attach the AC power cord to the EPS-LD unit until the unit is properly grounded at the electrical outlet and
the redundant power supply cord is connected.
the redundant power supply cord is connected.
One end of the EPS-LD cord has a keyed connector to ensure correct alignment of the connector
(
(
). The key is a plastic tab on the cord connector housing that fits into the EPS-LD unit to
ensure correct alignment of the connector.
Collin's
ES4K026
XM_054