3com 5500-ei pwr Installation Instruction

Page of 1072
 
2-5 
Displaying Monitor Link Configuration 
To do… 
Use the command… 
Remarks 
Display the information about 
one or all monitor link groups 
display monitor-link group 
{ group-id | all } 
Available in any view. 
 
Monitor Link Configuration Example 
Implementing Collaboration Between Smart Link and Monitor Link 
Network requirements 
As shown in 
, the PCs access the server and Internet through the switch. Configure Smart 
Link and Monitor Link to prevent the PCs from failing to access the server and Internet due to uplink link 
or port failure. 
Network diagram 
Figure 2-3 Network diagram for Monitor Link configuration 
BLOCK
Switch A
Switch B
Eth1/0/1
Eth1/0/2
Switch C
Switch D
Switch E
Eth1/0/1
Eth1/0/2
Eth1/0/3
Server
Eth1/0/2
Eth1/0/2
Eth1/0/1
Eth1/0/1
Eth1/0/3
Eth1/0/11
Eth1/0/10
Host A
Host D
Host C
Host B
Internet
 
 
Configuration procedure 
Enable Smart Link on Switch A and Switch B to implement link redundancy backup. Perform the 
following configuration on Switch A. The configuration on Switch B is the same as on Switch A. 
# Enter system view.  
<switchA> system-view 
# Enter Ethernet port view. Disable STP on Ethernet1/0/1 and Ethernet1/0/2.