LG LDG5315ST User Guide

Page of 120
20 INSTALLATION
Checking Operation of Bake / Broil 
Burners
To check ignition of the Bake burner, follow the steps 
below:
1
Remove all packing materials from inside the 
oven cavity.
2
Touch 
Bake. 350 °F appears in the display.
3
Touch 
Start.
It may take between 30 and 90 seconds for the 
burner to start heating.
To check ignition of the Broil burner, follow the steps 
below:
1
Touch 
Broil. Hi appears in the display.
2
Make sure the door is closed.
3
Touch 
Start.
It may take between 30 and 90 seconds for the 
burner to start heating.
NOTE
Do not try to light either the Bake or Broil burners 
during a power outage. The range has an 
electrical ignition system and cannot be used 
without power.
Adjusting Air Shutters (for LP 
Conversions)
The range comes from the factory with the air 
shutters adjusted for proper air flow for natural gas.  
If converted to LP, follow the instructions provided in 
the conversion kit to properly adjust the air shutters. 
LP conversion must be performed by a qualified 
technician.
Leveling the Range
Level the range by adjusting the leveling legs. 
Extending the legs slightly may also make it easier to 
insert the rear leg into the anti-tip bracket.
Use a level to check your adjustments. Place the level 
diagonally on the oven rack, and check each direction 
for level.
First check direction  . 
Then check direction  . If the level doesn’t show level 
on the rack, adjust the leveling legs.
1
2
Engaging the Anti-tip Device
Anti-tip 
bracket
Leveling leg
1
Slide the range against the wall, making sure 
the back leg slides into and engages the anti-tip 
bracket.
2
Check for proper installation by grasping 
the front edge of the cooktop and carefully 
attempting to tilt the range forward.