Netgear FSM7352S – ProSAFE 48 Port 10/100 L3 Managed Stackable Switch with 4 Gigabit Ports Hardware Manual

Page of 40
Managed Stackable Layer 3 Fast Ethernet Switches Hardware Installation Guide
2-6
Introduction
v1.0, March 2006
10/100M Ports 
 
One LED per 
port   
Right LED shows Link, Activity, and Speed
• Off: No 10/100 Mbps link is established on the port. 
• Solid green: A valid 100Mbps link is established on the port. 
• Blinking green: The port is sending or receiving packets at 
 
100 Mbps. 
• Solid yellow: A valid 10 Mbps link is established on the port. 
• Blinking yellow: The port is sending or receiving packets at 10 
Mbps. 
Left LED shows PoE, and PoE fault 
• Solid green: The PoE-powered device is connected, and the port is 
supplying power successfully. 
• Solid yellow: One of the following failures resulted in stopping power 
to the port:
• Short circuit on PoE power circuit.
• PoE power demand exceeds power available.
• PoE current exceeds classification for PoE powered device.
• Out of proper voltage band (44–57 VDC).
• Off: No PoE-powered device connected. 
10/100/1000M 
ports
Three LEDs per 
port 
Copper Link, and Activity LED
• Off: No 10/100/1000 Mbps link is established on the port. 
• Solid green: A valid 1,000 Mbps link is established on the port. 
• Solid yellow: A valid 10/100 Mbps link is established on the port. 
• Blinking green: The port is sending or receiving packets at 
1000Mbps. 
• Blinking yellow: The port is sending or receiving packets at 
 
10/100Mbps. 
SFP Link/ACT LED 
• Off: No 1,000 Mbps link is established on the port. 
• Solid green: A valid 1,000 Mbps link is established on the port. 
• Blinking green: The port is sending or receiving packets at 
 
1,000 Mbps. 
Stack LED
• Green: The stack partner successfully established the link. 
• Blinking green: The switch detects an active link, but the stack 
partner failed to establish the link.
• Off: No link, or the switch is in non-stack mode.
Table 2-3. FSM7352S LED Description  (continued)