Netgear RN3220 – ReadyNAS 3220 2U 12 Bay Diskless Hardware Manual

Page of 96
Depending on the system's last power state, the system might power on automatically.
For more information, see 
Note
3.
If necessary, press the Power button on the front panel of the system.
The system powers on.
Preferred Shutdown
You can gracefully shut down your system by using the Power button or the ReadyNAS local admin page.
For information about how to gracefully shut down your system using the ReadyNAS local admin page, see
the ReadyNAS OS 6.5 Software Manual, which is available at
To gracefully shut down your system using the Power button:
1.
Press the Power button on the front panel of the system.
The Power LED blinks, prompting you to confirm the shutdown.
2.
Press the Power button again.
The system shuts down gracefully.
Forced Shutdown
Perform a forced shutdown only if the storage system is not responding.
To perform a forced shutdown:
Flip the Power switch to the Off position.
The Power switch is located on the back panel of the system.
The system shuts down.
Power State
If the power supply is interrupted due to a power failure, the system returns to its last state once the power
supply is restored, as follows:
If the system was powered on at the time of the power failure, the system powers on when the power
supply is restored.
If the system was powered off at the time of the power failure, the system remains off when the power
supply is restored.
Boot Menu
Use the boot menu to restart or troubleshoot your ReadyNAS storage system.Your storage system provides
the following boot modes:
ReadyNAS 2120 and 2120 v2
14
ReadyNAS OS 6.5