Cisco Cisco ONS 15454 SONET Multiservice Provisioning Platform (MSPP) Installation Guide

Page of 42
Corporate Headquarters:
Copyright © 2002. Cisco Systems, Inc. All rights reserved.
Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA
Unpacking and Installing the Cisco ONS 15454 
Four-Shelf and Zero-Shelf Bay Assembly
Overview
The Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assemblies provide a dual-feed pre-wired 
TPA-type Fuse and Alarm Panel, two vertical fiber ducts, and two 2.38-inch vertical extenders and 
extender bases. The Four-Shelf Bay Assembly also provides a pre-installed, four-shelf configuration that 
includes four ONS 15454 shelf assemblies with configured backplane interface connectors (BICs). 
This guide describes how to unpack and install the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay 
Assembly. Because it is a complete system, installation simply requires you to remove the unit from the 
shipping pallet, move the unit into place, secure it, supply power and ground attachment.
This guide includes the following sections: