Cisco Cisco Expressway Installation Guide

Page of 21
1.
Log in as admin.
2.
Type xcom defaultlinksadd.
3.
Press Enter.
Specific Issues
Active Options Only Indicates ‘150 traversal calls’ for Large Deployments
To utilize the large-scale capabilities (500 traversal calls) of the Cisco Expressway, the CE1100 unit must have an
active 10 Gb network connection.
Lag During Boot up Due to Power Characterization Check
The power characterization test is run only once when you plug in and power up the CE1100. If the power
characterization test continues to run, causing a lag in the boot time, ensure that it is disabled in the CIMC. To do so:
1.
Log in to the CIMC (see
).
2.
Go to Server > Power Policies > Power Cap Configurations.
3.
Ensure that the Power Characterization at Boot check box is unchecked.
4.
Click Save Changes.
19
Cisco Expressway CE1100 Appliance Installation Guide
Troubleshooting