Cisco Cisco Catalyst 6500 Series Network Analysis Module (NAM-1 NAM-2) Installation Guide

Page of 26
 
8
Catalyst 6500 Series Switch and Cisco 7600 Series Router Network Analysis Module Installation Note
78-16855-01
  Specifications
SHUTDOWN Button
Caution
Do not remove the NAM from the switch until the NAM has shut down completely and the STATUS 
LED is orange. You risk disk corruption if you remove the NAM from the switch before the NAM 
completely shuts down.
To avoid corrupting the NAM hard disk, you must correctly shut down the NAM before you remove it 
from the chassis or disconnect the power. This shutdown procedure is normally initiated by commands 
entered at the supervisor engine CLI prompt or the NAM CLI prompt. 
Note
If disk corruption occurs, you can recover the disk by reupgrading the application image with the 
--install option. See the 
“Upgrading the NAM Application Software with Catalyst Operating System 
Software” section on page 4-17
.
If the NAM fails to respond to these commands properly, press the SHUTDOWN button on the front 
panel to initiate the shutdown procedure. 
The shutdown procedure may require several minutes. The STATUS LED turns off when the NAM shuts 
down.
Specifications
 describes the specifications for the NAM.
Orange
Indicates one of three conditions:
The NAM is running through its startup and self-test diagnostic sequence.
The NAM is disabled.
The NAM is in the shutdown state.
Off
The NAM power is off.
Table 1
STATUS LED Description (Continued)
Color
Description
Table 2
WS-SVC-NAM-1 and WS-SVC-NAM-2 Specifications
Specification
Description
Dimensions (H x W x D)
1.2 x 14.4 x 16 in. (3.0 x 35.6 x 40.6 cm)