Cisco Cisco Unified MeetingPlace Audio Server Installation Guide

Page of 217
Cisco MeetingServer 5.1 Installation Planning Guide  
 
53 
 
Cisco Systems 
                                  
March 2003 
Action 
Description 
9
9
9
9 
 Signaling 
…
 
E&M Wink Start, or 
…
 
E&M Wink Start, DTMF digits, and DID/DDI, or 
…
 
Loop start only 
… 
 Coding 
Format 
…
 
B8ZS (preferred), or 
…
 
Jammed Bit (bit stuffing), or 
…
 
AMI
13
 
… 
 Framing 
…
 
Extended super frame (ESF)
14
 (preferred), or 
…
 
Standard super frame D4 (SF/D4) 
… 
 Additional 
Hardware 
…
 
Channel service unit (CSU) required for each digital T1 
connection over 100 meters (330 feet) from demark; or 
from PSTN 
… 
8.
 
Modem 
Requirements 
…
 
Analog telephone line, or PBX connection 
…
 
Pilot number, accessible from outside 
…
 
RJ-11C connector 
… 
9.
 
Translation Table 
Translation table requirements for dialing restrictions 
… 
 
 
WARNING
The following telephony components or services can take 
from 4 to 6 weeks to order and install:  
 
Network Telco Service (trunk lines, main phone number or combined 
access numbers) 
 
PBX specific hardware or software (Smart Blades, software upgrade) 
 
Additional hardware (CSU, UPS) 
 
                                                      
13
 If AMI is used, the number of zeros in a row may exceed the recommended Telco value of 15. This can happen if all 
participants in the same meeting are on the same span. In that case, a 0s pattern could be sent to all channels at the 
same time, exceeding the zero’s maximum. This, in turn, can lead to meeting participants being dropped by the 
Telco from the meeting. Therefore, use B8ZS or Jammed Bit, if possible. 
14
 T1 facilities using D4 framing are susceptible to false triggering of “yellow alarm” signals. This false triggering can 
lead to dropped calls. Conferencing applications are particularly susceptible to this problem with D4 framing. The 
problem can occur when all 24 channels on a single span are in a conference and are carrying identical data streams. 
D4 transmission equipment in the network can falsely interpret the identical data on all 24 channels as a “yellow 
alarm” signal. For this reason, Latitude recommends configuring T1 spans for ESF framing.