Cisco Headend System Release 2.7 Installation Guide

Page of 190
 
Appendix D 
Direct ASI Rollback Procedures 
166 
4023737 Rev C 
Restart the BFS QAM 
Locate the power switch on the back panel of the BFS QAM and set it to the On 
position. 
Notes: 
 
The BFS sessions that you tore down earlier in this appendix will rebuild in 10 to 
15 minutes. 
 
After the BFS sessions have rebuilt, the indicator for the bfsServer process on the 
DNCS Control window will change from yellow to green. 
 
After the BFS sessions have rebuilt, the VDAT light on the BIG should illuminate.