Cisco Headend System Release 2.7 Guide De Montage
Appendix D
Direct ASI Rollback Procedures
166
4023737 Rev C
Restart the BFS QAM
Locate the power switch on the back panel of the BFS QAM and set it to the On
position.
position.
Notes:
The BFS sessions that you tore down earlier in this appendix will rebuild in 10 to
15 minutes.
15 minutes.
After the BFS sessions have rebuilt, the indicator for the bfsServer process on the
DNCS Control window will change from yellow to green.
DNCS Control window will change from yellow to green.
After the BFS sessions have rebuilt, the VDAT light on the BIG should illuminate.