Cisco Headend System Release 2.7 Installation Guide

Page of 190
 
Chapter 2    DNCS Pre-Upgrade Procedures 
 
 
 
52 
4023737 Rev C 
4  When the Curr Stt (Current State) field of the Applications Control window 
indicates that all of the Application Server processes have stopped, follow the 
on-screen instructions to close the Applications Control window. 
5  Type appKill and then press Enter. The appInitd process stops. 
 
Stopping the Time Warner Mystro Application Server 
If the site you are upgrading uses the Time Warner Mystro Application Server 
(MDN), refer to the documents provided by Mystro to shut down the Mystro 
Application Server. 
 
Preparing the Rovi Application Server 
Refer to Aptiv Technical Note Number 41. Complete steps 1 through 3 to prepare 
the Rovi Application Server for the service pack upgrade. 
Note:  Contact the Rovi Corporation for the latest copy of the technical note. 
 
Stopping the DNCS 
1  At the DNCS, press the middle mouse button and then select DNCS Stop. A 
confirmation message appears. 
2  Click Yes
3  From an xterm window on the DNCS, type dncsControl and then press Enter
The Dncs Control utility window opens. 
4  Type 2 (for Startup/Shutdown Single Element Group), and then press Enter. The 
system displays all DNCS processes. 
Note: The system updates the display periodically, or you can press Enter to 
force an update. 
5  When the Curr Stt (Current State) field of the utility window indicates that all of 
the DNCS processes have stopped, follow the on-screen instructions to close the 
Dncs Control window.