Cisco Cisco CRS Line Card Chassis Enhanced Installation Guide

Page of 35
Moving the Cisco CRS 8-Slot Line Card Chassis Enhanced Router
This section describes the procedures required to move the Cisco CRS 8-Slot Line Card Chassis Enhanced router to its final location.
This section contains the following topics:
The installation of a Cisco CRS 8-Slot Line Card Chassis Enhanced router may require space, floor loading,
power, and cooling modifications to your facility. Site planning should have been performed well in
advance of the scheduled delivery of your system. See the
Note
Moving Guidelines for the Cisco CRS 8-Slot Line Card Chassis Enhanced Router
We recommend that at least two people move the as-shipped chassis from the shipping dock to the installation site. Make sure that
you have at least three people to transport the chassis up and down a ramp. We also recommend that you leave the as-shipped chassis
attached to its pallet for moving. Follow these guidelines:
• Chassis installation location must be identified.
• Packaging should be removed while leaving the chassis firmly secured to the pallet.
To ensure that the chassis has proper access to the installation location, see
Note
• Identify the type of suitable moving device that will be used to move the as-shipped chassis from the loading dock or staging
area to the installation site.
• Make certain all doorways and hallways are wide and tall enough for the moving the as-shipped chassis. The 8-slot chassis
needs an aisle of approximately 60 inches in width.
• Make sure that you have at least one person on each side of the chassis.
• When transporting the as-shipped chassis on a ramp , follow these guidelines:
◦Make sure that you have at least three people to transport the chassis up and down a ramp. One person in the rear pushing,
one person at the front pulling, and one steering the chassis.
◦Exercise extreme caution when moving chassis up an incline of any angle.
If the route to the installation site has any ramps, use a moving device other than a scissor lift to move the
chassis over the ramps, and then transfer the chassis onto a suitable lifting device such as a scissor lift for
installation. Leave the blanks and impedance carriers in place in empty card slots while you move or install
the chassis in the rack. The blanks and impedance carriers provide support to keep the chassis square
during movement and installation.
Caution
18