Cisco Cisco CRS Line Card Chassis Enhanced Installation Guide

Page of 35
Moving the Chassis to the Final Location
This section describes how to move the as-shipped Cisco CRS 8-Slot Line Card Chassis Enhanced router. The 8-slot chassis is shipped
preinstalled with four vertical rack mounting rails for installing the chassis. For stability and support, leave the mounting brackets
installed when you move the chassis.
The chassis is shipped with blanks and impedance carriers installed or slot covers installed over all slots.
Leave these in place to maintain chassis stiffness and integrity during moving.
Caution
To move the 8-slot chassis to its installation location, follow these steps:
Procedure
Step 1
Make sure you have a suitable lifting device to move the Cisco CRS 8-Slot Line Card Chassis Enhanced router.
Step 2
Move the chassis to its installation location.
What to Do Next
After moving the chassis to the room or area where you will install it, begin the procedure to mount the chassis into the rack.
Preparing the Rack for Chassis Installation
Install the Cisco CRS 8-Slot Line Card Chassis Enhanced router into a four-post 19-in. standard rack with standard horizontal mounting
rails.
For more detailed information about rack requirements for the Cisco CRS 8-Slot Line Card Chassis Enhanced router, see the
section in Chapter 3 of
Before you move the chassis or mount the chassis into the rack, we recommend that you do the following:
Procedure
Step 1
Place the rack where you plan to install the Cisco CRS 8-Slot Line Card Chassis Enhanced router.
Step 2
Secure the rack to the floor.
The chassis should be mounted on a rack that is permanently affixed to the building. Statement
1049
Warning
To bolt the rack to the floor, a floor bolt kit (also called an anchor embedment kit ) is required. For information on bolting
the rack to the floor, consult a company that specializes in floor mounting kits (such as Hilti; see Hilti.com for details).
Make sure that floor mounting bolts are accessible, especially if annual retorquing of bolts is required.
19