Cisco Cisco ONS 15454 M2 Multiservice Transport Platform (MSTP)

Page of 98
Procedure
Step 1
In node view (single-shelf mode) or multishelf view (multishelf mode), click the Provisioning Comm Channels PPC
tab. If you are in network view, click the Provisioning Provisionable Patchcords tab.
Step 2
Click the provisionable patchcord that you want to delete.
Step 3
Click Delete.
Step 4
In the confirmation dialog box, click Yes.
Step 5
Return to your originating procedure (NTP).
NTP-G86 Convert a Pass-Through Connection to Add/Drop Connections
This procedure converts a pass-through connection into
add/drop connections (one on the add side and the other on the
drop side). Use this procedure during a network upgrade.
Pass-through channel connections can be provided between
channel input and output ports for the AD-xC-xx.x, 4MD-xx.x,
32MUX-O, 32DMX-O, 32DMX, 32DMX-L, 40-MUX-C, and
40-DMX-C/40-DMX-CE cards. You can set up pass-through
connections in nodes that might require more add or drop
channel capability or configuration.
Purpose
None
Tools/Equipment
"DLP-G46 Log into CTC" task in the "
document.
Prerequisite Procedures
As needed
Required/As Needed
Onsite or remote
Onsite/Remote
Provisioning or higher
Security Level
Procedure
Step 1
In node view (single-shelf mode) or multishelf view (multishelf mode), click the Circuits tab. Delete the unidirectional
or bidirectional pass-through optical channel network connection (OCHNC) that applies to the pass-through connection
to be removed.
Step 2
Remove the physical pass-through cabling. Click the Provisioning WDM-ANS Internal Patchcords tabs to identify
the card ports to be removed. The pass-through connection that you are removing can be connected in both OADM and
hub nodes.
71