Cisco Cisco Prime Network Services Controller Adaptor for DFA Leaflet

Page of 80
Step 4: Upgrading the Second Border Leaf Pair
You can perform a disruptive in-service software upgrade (ISSU) for the second border leaf pair.
Step 1
Upgrade the second border leaf node in the pair from Cisco NX-OS Release 6.0.(2)N2 to Cisco NX-OS Release
7.0.(0)N1(1) using an ISSU disruptive upgrade procedure. See the
for information on the ISSU upgrade.
Step 2
Verify that the border leaf comes up fully and becomes operational again.
Step 3
Verify that traffic streams are already running intra-VLAN, inter-VLAN, and across pods, and that the north-bound
traffic all remains unaffected.
Step 4
Repeat Steps 1 to 3 for the second border leaf node in the pair.
Although the disruptive upgrade has some effect on traffic, there is no change in the traffic flow.
What to Do Next
Configure the border leaf pair with Cisco Dynamic Fabric Automation.
Step 5: Configuring the Second Border Leaf Pair
In this procedure, you will manually configure the second pair of border leafs in the network.
For specific configuration commands and examples, see
Migration Configuration, on page 29
.
Note
Before You Begin
Make sure that you have upgraded the border leaf software, as described in Step 4.
Step 1
On the first border leaf switch in the pair, do the following:
a) Configure the additional Hot Standby Router Protocol (HSRP) per VLAN with the anycast gateway MAC address
and an unused IP address.
b) Configure the iBGP router reflector client.
c) Configure the anycast-gateway MAC address.
d) Add a vrf-tenant-profile and configure the virtual network identifier (VNI) under the virtual router
e) Create switch virtual interfaces (SVIs), if they are not present.
f) Enable anycast-gateway on the SVIs.
g) Enable traditional forwarding on the switch virtual interfaces (SVIs)
h) Advertise host routes to the BGP route reflector
Step 2
Repeat Step 1 for the second border leaf switch in the pair.
   Cisco Dynamic Fabric Automation Migration Guide
24
OL-31503-01   
Migration Steps
Step 4: Upgrading the Second Border Leaf Pair